Blending Silos of main structure was developed in the content of Balikesir Glass Fiber Factory Campus Design. In addition to, 16 steel silos where in this building, were designed (2 m ~3.6 m diameter, approximately 13 m height) for finished granular material and shop-drawings were prepared by OTS.
YEAR OF CONSTRUCTION
2018
CUSTOMER
SISECAM GLASS FIBER A.S
LOCATION
BALIKESIR