Slip tests were performed in regard to the brick walls, as well as damage survey and load bearing system survey were carried out at the first stage of the project. At the second stage, strengthening design was developed by OTS considering the intended use of the historical building.
YEAR OF CONSTRUCTION
2011
CUSTOMER
LOCAL ADMINISTRATION OF ISTANBUL PROVINCE
LOCATION
BEYOGLU/ISTANBUL