OTS performed damage surveys. Also, improvement design and shoring design were developed by OTS within the scope of restoration of a 2000-year-old Roman bridge which was believed to be built in 50 AD.
YEAR OF CONSTRUCTION
2009
CUSTOMER
GUNER TASARIM
LOCATION
DERINCE/KOCAELI