Performance analysis was conducted based on obtained results of load bearing system survey and identification of material characteristics for existing structures of the production and administrative areas. Strengthening design was developed for identified weak points.
YEAR OF CONSTRUCTION
2021
CUSTOMER
Mioro Hediyelik Eşya San. Tic. A.Ş.
LOCATION
ISTANBUL