Okcu Musa Primary School

With the on-site survey of the building load bearing system was performed at the first stage of the project. In the light of the information obtained from the site, strengthening designs for restoration of the structure were developed by OTS.

YEAR OF CONSTRUCTION

2012

CUSTOMER

ES YAPI MIMARLIK

LOCATION

BEYOGLU/ISTANBUL