The mosque original design project and material tests data was obtained from the customer. Subsequently, an earthquake performance analysis was conducted by OTS. Obtained results along with recommendations on strengthening methods were reported to the customer.
YEAR OF CONSTRUCTION
2018
CUSTOMER
PETKIM PETROKIMYA A.S.
LOCATION
ALIAGA/IZMIR