Architectural-and structural designs were developed for this heavy industry facility. In addition, structural design of the mechanical column was also developed within the scope of the project.
YEAR OF CONSTRUCTION
2015
CUSTOMER
POLISAN HOLDING
LOCATION
DILOVASI/KOCAELI