Performance analysis of the current condition was carried out and strengthening point details were developed in regard to detected weaknesses within the scope of the restoration works of the bridge located over the railway.
YEAR OF CONSTRUCTION
2019
CUSTOMER
GUNER TASARIM
LOCATION
SAMSUN