A 22.5 m high tower, where the first Turkish national radar was installed, has reinforced concrete shear wall load bearing system. OTS company developed structural, architectural, mechanical, electrical and infrastructure designs for the tower structure and a 2-storey building located next to it.
YEAR OF CONSTRUCTION
2018
CUSTOMER
TUBITAK
LOCATION
GAZIANTEP